Skip to content

Guided project cost wizard

The same cost model as the main estimator, broken into four decisions instead of one long form. Choose the trade, describe the space and its dimensions, set the finish level, then review the itemized budget. It is the easier route if you have not priced a renovation before, or if you are working on your phone.

Behind each step sits the same arithmetic: a per-square-foot material rate at your chosen quality tier, a consumables rate, and trade labor hours priced at that trade's hourly rate, with a 10% contingency added on top. All 16 trade categories are available here, and anything you build carries over to the full estimator — both routes read the same draft from your browser.

Figures are planning estimates from typical national rates, not a quote. See the cost accuracy disclaimer, or read the cost guides for what actually moves the price on a given job.

How it works: 4 steps

Step 1 of 4

Work Activity Selection

16 Categories