This page explains exactly how the estimator arrives at a number, so you can judge for yourself how much weight to put on it.

How the calculation works

Every line item is built from four components:

  • Materials — area multiplied by a per-unit material rate for the quality tier you pick.
  • Consumables — fasteners, adhesives, tape, blades, sealant and similar, as a per-unit rate.
  • Labor — area multiplied by typical hours per unit, multiplied by a trade hourly rate.
  • Contingency — a 10% buffer added on top of the subtotal.

The total is then presented as a range rather than a single figure, because a single figure implies a precision that no estimate built from typical rates can honestly claim.

Why your real cost will differ

  • Region. Labor rates vary widely between metros and rural areas, and between states. The rates here are national-typical, not local.
  • Site conditions. Rot, asbestos, knob-and-tube wiring, failed subfloor, out-of-level framing and undersized service all surface after demolition and can move a project substantially.
  • Material volatility. Lumber, copper and finished goods move with supply and tariffs.
  • Scope creep. The most common cause of overruns is not mispricing, it is deciding mid-project to do more.
  • Permits and inspections. Fees, plan review and required upgrades vary by jurisdiction and are not modelled here.
  • Contractor demand. The same job is priced differently by a busy firm and a hungry one.

What this tool does not include

  • Permit and plan-review fees
  • Design, architectural or engineering fees
  • Structural work, or repairs discovered after demolition
  • Hazardous material testing or abatement (asbestos, lead paint)
  • Appliances, furnishings and decor unless you add them as line items
  • Sales tax, delivery, dumpster and disposal fees
  • Financing costs and temporary accommodation

Use it as a starting point

A good use of this tool is to walk into contractor conversations knowing roughly what the work should cost and what drives the number. A bad use is to commit to a budget or sign a contract based on it. Always get written bids from licensed professionals for your specific property.

Read more about the method in how to estimate a home renovation.