Roof Replacement Cost: Tear-Off, Decking, Permits

Published

A full roof replacement is priced off three things: the roof surface area, the shingle or panel tier you choose, and how much of the wood decking underneath has to be replaced once the old roof comes off. The calculator on this page uses a labor rate of $70/hr and 0.035 labor hours per square foot, which works out to about $2.45/sq ft of labor plus $0.35/sq ft of consumables such as fasteners, underlayment, flashing, and disposal before any roofing material is added. Everything below explains what moves those numbers, including the parts nobody can see until the tear-off starts. Roofing is licensed, permitted, fall-hazard work, and this guide assumes you are hiring it out.

Estimated cost for 1,200 square feet of roofing work, including a 10% contingency buffer.
Quality tierMaterialsLaborConsumablesTotalPer sq ft
Budget$2,640$2,940(42 hrs)$420$6,600$6
Mid-range$4,680$2,940(42 hrs)$420$8,844$7
Premium$9,000$2,940(42 hrs)$420$13,596$11

Figures are generated by this site's estimator using a labor rate of $70/hour and 0.035 hours per sq ft. They are planning baselines, not quotes, and will vary with your region, site conditions and contractor.

What is actually in a roof replacement estimate

A re-roof bid is not one line item. It is a demolition job, a waterproofing job, and an installation job stacked on top of each other, and each one carries its own labor.

At the rates this tool uses, a 1,200 sq ft roof surface carries roughly 42 labor hours, or about $2,940 in labor, plus about $420 in consumables. Material sits on top of that: at the basic tier the tool models $2.20/sq ft, mid-range $3.90/sq ft, and premium $7.50/sq ft, which lands a 1,200 sq ft job somewhere between roughly $6,000 and $12,400 all-in before decking repairs or permit fees. Costs vary by region and by season, so treat every figure here as a planning baseline rather than a quote.

Roofers usually quote in squares rather than square feet. One square is 100 sq ft, so a 1,200 sq ft roof is 12 squares. Divide a per-square price by 100 before comparing it against a per-square-foot estimate.

  • Tear-off of the existing roofing down to the deck, plus dumpster and disposal fees
  • Deck inspection and any sheathing replacement, almost always billed separately
  • Drip edge and synthetic felt underlayment across the field
  • Shingle or panel installation, ridge cap ventilation, and step and valley flashing

Labor and consumables in this dataset are the same per square foot at every tier, so upgrading materials raises your total but not your install cost.

What drives roof replacement cost up or down

Square footage is the starting point, but the same 1,200 sq ft of roof can price very differently depending on what the crew has to work around.

Pitch is the biggest single multiplier. A walkable roof lets a crew move fast. A steep roof means harnesses, roof jacks, and slower production, which shows up as more hours against the same area. Height matters for the same reason.

Complexity is the second driver. Every valley, dormer, skylight, chimney, and pipe boot is a place where water can get in, so each one gets flashed by hand. A simple gable roof with two planes is far cheaper per square foot than a cut-up roof with the same footprint.

  • Roof pitch, and whether the crew can walk it safely without staging
  • Number of layers being torn off, since two layers means twice the demolition and disposal
  • Valleys, dormers, chimneys, skylights, and pipe penetrations that need flashing
  • Material tier, from architectural shingles up through standing seam metal and synthetic slate

Decking surprises: the cost nobody can quote in advance

The plywood or plank sheathing under your shingles is invisible until the tear-off. If water has been getting past a failed flashing for a few seasons, sections of it will be soft, delaminated, or rotted through, and they have to be replaced before anything goes back on.

No honest roofer can tell you how much decking is bad from the ground. What a good roofer can do is quote a unit price up front, so the surprise becomes a known rate instead of a negotiation while your house is open to the sky. Ask for the per-sheet price to replace 4x8 sheathing in writing, and ask what happens if the entire deck has to come off.

Budget for some decking work rather than none. A contingency of 10 to 15 percent of the job total is a reasonable cushion on an older roof, and anything unused stays in your pocket.

How a bid should handle what the tear-off uncovers
What the crew findsWhat it usually meansWhat the contract should say
Isolated soft spotsA localized leak, often near a flashing or valleyPer-sheet unit price, billed only for sheets actually replaced
Widespread delaminationLong-term moisture, frequently with poor attic ventilationUnit price plus a written cap or a stop-work-and-reprice clause
Spaced plank deckingOlder construction that may not accept modern fasteners as-isOverlay sheathing quoted as a separate scope before work starts
Rot at the fascia or rafter tailsStructural, not just sheathingCarpentry split out as its own line, and possibly an inspection

Be cautious with a bid promising unlimited decking replacement at no extra cost. That risk is priced in somewhere, usually as a higher base number or a thinner spec.

Permits, licensing, and code requirements

Re-roofing almost always requires a building permit, and in most places it requires a licensed and insured roofing contractor to pull it. Permit fees, inspection scheduling, and any code-triggered upgrades are real line items, so ask whether the bid includes them.

Codes vary by jurisdiction, and a re-roof is often the moment older work has to be brought current. Common triggers include ice barrier requirements in cold climates, minimum attic ventilation ratios, drip edge, and limits on how many roofing layers a structure may carry. Your building inspector, not your contractor, has the final word on what your local code demands.

Verify the license and insurance yourself rather than accepting a photocopy. Check the license number with your state or municipal licensing board, and ask the carrier to send the certificate directly. Workers compensation matters most, because an uninsured crew member hurt on your roof can become your exposure.

  • Confirm who pulls the permit and whether the fee is included or billed through
  • Verify the contractor license number directly with the issuing authority
  • Request a certificate of insurance from the carrier, including workers compensation

How an insurance claim changes the math

If your roof failed from a covered event such as hail or wind, your insurer may pay for the replacement, and the accounting works differently from a cash job. Policies settle on either actual cash value, which deducts depreciation for the age of the roof, or replacement cost value, which pays that depreciation back after the work is completed and documented. Check which one you carry before you assume a number.

You still owe your deductible. Any contractor who offers to waive it, absorb it, or bill around it is proposing something that ranges from a bad idea to insurance fraud depending on your state. That is a reason to end the conversation.

Insurance scopes come from an adjuster inspection and frequently miss what the crew finds later, including decking. That is what a supplement is for. Photograph the tear-off and have your contractor document any added scope in writing while the roof is still open.

  • Read whether your policy pays actual cash value or replacement cost value
  • Have the contractor document decking and flashing findings in writing during the work
  • Do not sign a blanket assignment of benefits without understanding what you are handing over

Run the estimate on this page independently of the insurance scope. A second number built from different assumptions gives you something concrete to point at when you ask for a supplement.

DIY versus hiring a roofing contractor

This is the one category where the answer is not close. Roof work is a leading fall hazard in residential construction, and a fall from a single-story eave is enough to cause permanent injury. Add a tear-off, loose debris underfoot, a pitched walking surface, and a full day of carrying bundles, and the risk is not something a weekend of research offsets. Do not DIY a roof replacement.

The legal picture points the same direction. Most jurisdictions require a licensed contractor and a permit for a re-roof, unpermitted roofing tends to surface as a problem at resale, and manufacturer shingle warranties are commonly void without a qualifying installation. If you are financing the work or claiming it on insurance, self-performed labor may not qualify at all.

What you can usefully do is everything that is not on the roof. Measure your footprint from the ground to sanity-check the square footage in a bid, compare bids line by line on identical scope, get the decking unit price in writing, and photograph the attic for water staining before anyone starts.

  • Get at least three bids written to the same scope, material tier, and underlayment
  • Ask each bidder for the per-sheet decking price and the disposal method in writing
  • Confirm ventilation work is included, since attic airflow drives how long the new roof lasts

Roofing is licensed, permitted work performed at height. Hire a licensed and insured contractor, and never let anyone work on your roof without fall protection.

Frequently asked questions

How much does it cost to replace a roof?
Using the rates in this calculator, a 1,200 sq ft roof surface runs roughly $6,000 at the basic material tier and roughly $12,400 at the premium tier, including about $2,940 of labor and $420 of consumables. Decking replacement, permit fees, and steep or complex rooflines push that higher. Costs vary by region, so treat these as planning baselines and get local bids.
Do I need a permit to replace my roof?
In most jurisdictions, yes. A full tear-off and re-roof is permitted work, and many areas require a licensed roofing contractor to pull the permit and schedule the final inspection. Requirements vary by city and state, so confirm with your local building department before signing a contract.
How much does it cost to replace rotted roof decking?
It depends entirely on how many sheets are bad, which nobody can know until the old roof is off. Ask your contractor for a written per-sheet unit price to replace 4x8 sheathing before work starts, so the cost is a known rate rather than a mid-job negotiation. Setting aside 10 to 15 percent of the job total as a decking contingency is a reasonable plan for an older roof.
Can I replace my own roof?
You should not. Roof work is a leading cause of falls in residential construction, and a fall from even a single-story eave can cause permanent injury. Beyond the safety issue, most jurisdictions require a licensed contractor and a permit for a re-roof, and self-installation commonly voids the manufacturer shingle warranty.
Will insurance pay for a new roof?
Insurance may cover a roof that failed from a covered event such as hail or wind, but generally not one that simply wore out with age. Whether you receive full replacement cost or a depreciated actual cash value payout depends on your specific policy, and you still owe your deductible. Read your policy language and speak with your adjuster before assuming a number.
Can I put a new roof over the old shingles?
Some codes allow a second layer over an existing one, and it is cheaper up front because it skips the tear-off. It also hides the condition of the decking, adds weight, tends to shorten the life of the new roof, and makes the eventual tear-off more expensive. Many jurisdictions cap how many layers are allowed, so check your local code first.
How long does a roof replacement take?
At the labor rate this tool uses, a 1,200 sq ft roof models out to about 42 labor hours, which a full crew typically completes in one to three working days. Steep pitches, complex rooflines, extensive decking replacement, and weather all extend that. Ask your contractor how many crew members will be on site and what their weather policy is.